Don't renovate,give me an office now

 

We advocate that the office space created is "living", which is dynamically and  flexibly combined with the requirements of the owners.

In the business activities of the enterprise, the office as a carrier for business operations, it needs to ensure that enterprises can be efficient to carry out business activities.
Therefore, office renovation has been a very big headache for business owners, in addition to human, material and financial investment, the most cautious and helpless is that it can not follow the development of business changes. Once the office layout is designed and finalized, it will not be able to be changed later on when it is put into use. When the organization changes, when teams expand or contract, when there are temporary projects, the office cannot accommodate the unfolding business behavior and the initial investment in renovations can become a wasteland.

Project: A game company office

Property: Office building

Size:812㎡

Interior Decoration

 

Partition wall works

Prefabrication and installation of door frame

Prefabrication and installation of door leaf

Prefabrication and installation of window frame

Prefabrication and installation of window sashes

Prefabrication and installation of partition wall frame

Prefabrication and installation of partition wall surface decoration

 

Ceiling Engineering 
Ceiling stud hoisting
Inspection and confirmation of ceiling concealed works
Ceiling sealing plate

Ceiling finishing

 

Ground engineering
Concrete cushion leveling
Stone and floor tile pavement
Cement based self-leveling
Carpet, rubber floor and wood floor pavement  

 

System furniture engineering
Prefabrication and installation of movable room
Prefabrication and installation of movable furniture
House / furniture strong electricity connection

Weak current connection of room / furniture

 

Positioning accessories Engineering
Prefabrication and installation of company logo
Area name prefabrication and installation 
Image wall prefabrication and installation

Prefabrication and installation of decorative lamps

M&E Installation Work

 

Air conditioning engineering

Equipment adjustment and installation

Installation and insulation of flue pipe and water pipe

Manufacture of air supply (return) pipe

Installation of air supply (return) outlet

Air conditioning system test

 

Fire engineering 

Adjustment and installation of spray pipe (head)
Installation of smoke (temperature) sensing pipeline

 Installation of smoke (temperature) probe

Fire protection system test

 

Water supply and drainage engineering

Layout of water supply pipeline
Layout of drainage pipeline
Installation of terminal apparatus (equipment)

Water supply and drainage system test

 

Strong electricity engineering

Erection of pipeline trench
Strong electricity installation (excluding furniture)
Installation and wiring of power box
Installation of sockets, switches and lamps

Strong current system test

 

Weak current engineering

Erection of pipeline trench
Weak current threading
Installation and wiring of network cabinet
Socket and equipment installation

Wak current system test

(case: the rental property of an office building which has provided air conditioning, fire protection, water supply and drainage, and raised floor at the delivery time)

Air quality
Formaldehyde   ≤ 0.10mg/m³
Ammonia ≤ 0.20mg/m³
Benzene ≤ 0.09mg/m³
TVOC ≤ 0.60mg/m

Project: A game company office
Size:812m²
Staff:93
 can be increased to 121
Efficient :
8.73m² / (person)
Characteristic

1、The design plan shall be delivered for use within 20 days after the determination of the design plan;
2、Except for strong and weak current projects, they are all assembly operations;
3、After being put into use, it can be reorganized according to the demand;
4、Activity room and furniture can 100% be reused.

Design planning
Office:4
Meeting room:4
Game testing room:3
Fitness room:1
Open lounge:5
Coffee & Print:1
Workstations :88(can be incresed to116)

Lighting quality

Illumination
Computer work:200-300lx
General reading:500-750lx
Precise reading :1000-1500lx

Color Temp:4000K
CRI(color rendering index):Ra ≥ 85 

Office
Size:W2500D1840H2340
Colour:White+Warm grey(
Option colors)
Space:4.60 m²

Functions 

Air purification

Intelligent control

Moderate quietness

Overall simple movement

Quick installation of main body

Quick replacement of interior trim panel

Free installation of door

Optional light location

Addition and subtraction of module opening and closing

Silver ion antibacterial

(Optional)

Healthy lighting

Silver ion antibacterial

Optional

Free installation of door

Quick replacement of interior trim panel

Quick installation of main body

Overall simple movement

Moderate quietness

Intelligent control

Healthy lighting

Functions 

Air purification

Studio

Size:W1660D1460H2250
Colour:White+Cold grey(Option colors)
Space:2.42 m²

+

Game testing room

Size:W1660D1460H2250
Colour:White+Yellow(Option colors)
Space:2.42 m²

Air purification

Functions 

Healthy lighting

Intelligent control

Moderate quietness

Overall simple movement

Quick installation of main body

Quick replacement of interior trim panel

Free installation of door

Silver ion antibacterial

Optional

L
+

Negotiation room

Size:W2500D1840H2340
Colour:White+Warm grey(
Option colors)
Space:4.60 m²

Silver ion antibacterial

(Optional)

Air purification

Functions 

Healthy lighting

Intelligent control

Moderate quietness

Overall simple movement

Quick installation of main body

Quick replacement of interior trim panel

Free installation of door

Optional light location

Addition and subtraction of module opening and closing

Quick replacement of interior trim panel

Quick installation of main body

Tea space
Size:W1000D1000H2250
Colour:White+White(Grey or Black)
Space:1.00 m²

Functions 

Healthy lighting

Print booth

Size:W1000D1000H2250
Colour:White+White(Grey or Black)
Space:1.00 m²

Overall simple movement

Silver ion antibacterial

Optional

+

Most business owners who used leased properties had an office life expectancy of essentially no more than three years. For this reason, they may be incurring a significant renovation investment every three years. For those who have their own property, they need to change the working areas of their teams almost every three months to accommodate their business projects. They have to remodel their office space no less than 3 times a year and each time the renovation is repeated “demolish” and “build”.
ARTLAND has been looking for a "living asset" model to build a flexible office space for enterprises through modular movable office. It can be flexibly organized and changed dynamically to follow the development of the enterprise. When the location of the office needs to be changed, it can be easily moved away by simply moving the pulley mechanism.When the size of the space needs to be changed, it can be done quickly by simply adding or removing modules.

S
M
+
+
+
XL

Silver ion antibacterial

Optional

Free installation of door

Quick replacement of interior trim panel

Quick installation of main body

Overall simple movement

Moderate quietness

Intelligent control

Healthy lighting

Functions 

Air purification

Negotiation room

Size:W1660D1460H2250
Colour:White+Yellow(Option colors)
Space:2.42 m²